Pho:86-21-64065727/54855598
Tel:13818736199
Fax:86-21-62215879
E_mail:shwanxu@163.com
Name:Zhao li (sales manager)
Sanding machine maintenance
First check: new start using or replace the product after 4 hours
The second check: interval of 1 day after the previous check
Check for the third time: interval after the previous 3 days
Fourth check: interval after the previous 5 days
Fifth, check: interval after the previous 7 days
, after inspection: every other week
Note: if the one on the same pulley fracture need to change, must at the same time to replace in the same other belt on the pulley. Even second-hand sanding machine is also an expensive things, no matter for personal or company, this is not a small items so regular preventive maintenance and must keep up with.
Prev:Wire rope conveyor belt
Next:Quality status quo of Shanghai conveyor belt manufacturers